Construction Update: 7.30.2020
Set-up of the construction trailer began. The three-wide unit was placed and leveled, pulled together, connected and mounted on its foundation blocks. Conduits for power and water are being brought in through newly dug trenches. The trailer is a temporary space that will be the headquarters for the Abbott Construction team until work on the campus is completed.
Photos Courtesy of Bill Youngblood